Interior Designer · Dubai

Interior design in Dubai — restraint in a city that rarely asks for it.

Dubai has no shortage of interiors that shout. What is harder to find is a room that is quiet, warm and genuinely made. Many homes here arrive as a finished shell — a tower apartment with a wall of glass and a developer kitchen, a penthouse sold on its view, a villa in a master-planned community built to a standard plan — and the market around them moves quickly. The work is to slow the room down without slowing the project.

NYKS is a studio in Jaipur, and we take on a Dubai project as a whole: we lead the design, commission the craft, run the programme and inspect what is built. The parts the emirate reserves for licensed firms — submitting drawings, holding permits, building — are carried out by the licensed Dubai consultant and fit-out contractor we bring onto the team with you. Our built work is in Jaipur and Udaipur. Principal Designer Nishtha Kandoi worked at Gensler and AS+GG in Chicago and KPF in New York, so the logic of a tower — its core, its risers, its curtain wall — is familiar ground.

Published in AD Middle East, made in Jaipur

AD Middle East featured Sum, Jaipur — a boutique hotel in a 100-year-old manor house. Architecture: Gagan Sharma · Interiors curated by NYKS. Read the feature. Sum shows how we treat a shell we did not build: keep what has character, place objects one at a time, add nothing for effect. A Dubai apartment needs the same discipline, and needs it more.

  • Private ResidenceMustard velvet, sculpted ceilings and brass light: the warmth a glass-walled tower apartment usually lacks.
  • Private LoungeA billiards room and fireplace lounge planned for entertaining, which is much of what a Dubai penthouse is asked to do.
  • Boutique StoreStone-textured walls and gallery light for retail, relevant to Dubai shopfront and boutique fit-outs.

From the Jaipur studio to a Dubai tower

The studio keeps Jaipur hours, 10:00 to 20:00 IST, which is 08:30 to 18:30 in Dubai: your whole working day overlaps with ours. Nonstop flights from Jaipur take about three and a half hours. A project moves in six steps.

In India the studio builds what it draws; in Dubai it draws, commissions and inspects — more on how the studio works.

  • Brief and survey: a call, then a visit to measure the unit and read the building’s fit-out rules.
  • Design and samples: plans and joinery drawings, with samples of stone, plaster, fabric and brass couriered to you, because colour on a screen misleads.
  • Coordination and tender: the project is modelled and coordinated in 3D before it is built, then priced by licensed Dubai fit-out contractors. You appoint one.
  • Approvals and making, in parallel: the contractor secures the no-objection and the permit while craft and furniture are made in Jaipur.
  • Site visits before walls and ceilings close, when joinery and craft go in, and at snagging; in between, a weekly review of the contractor’s photographs and a video call.
  • Handover: we inspect against the drawings and schedules; the contractor closes out the completion approvals.

Law No. 7, the permit and who signs for it

Dubai Law No. 7 of 2025, in force since 8 January 2026, regulates contracting across the emirate, free zones and DIFC included. Only contractors licensed and listed on the contractor register run by Dubai Municipality may carry out contracting work; subcontractors need approval too, and owners may not appoint anyone unregistered. So the construction sits with a registered contractor — one we tender to and then work alongside. NYKS leads the design, commissions the craft, coordinates the team and inspects what is built against the drawings; the contractor submits, permits and builds.

Loose furniture, art and soft furnishings rarely need a permit. Moving walls, services or wet areas does, so we decide early which changes are worth the approval. The route depends on who governs the plot:

  • Dubai Municipality on most of the mainland, including Dubai Marina.
  • Trakhees in areas under Ports, Customs and Free Zone Corporation and Nakheel, such as Palm Jumeirah.
  • Dubai Development Authority in its zones, such as Dubai Design District and Dubai Media City, where the contractor applies with the building owner’s no-objection.
  • Before any of these, a no-objection from building management in a tower, or from the master developer in a villa community.
  • Dubai Civil Defence for anything that touches fire and life safety: sprinklers, detectors, escape routes and the fire rating of finishes.

Heat, glare, humidity and the shamal

July and August highs average around 43 °C. On the coast humidity can climb above 90 per cent, and the summer shamal lifts fine sand that finds every open joint. Indoors the air is chilled and dry. Materials fail in the gap between the two. In a tower, glare through floor-to-ceiling glass is the first comfort problem; the shell arrives hard and bright, and the work is softening it.

  • Sheers and blinds built into the ceiling detail from the start rather than added later; they do more for comfort than another degree of cooling.
  • Solid timber kiln-dried for air-conditioned rooms and acclimatised on site before fixing; joinery on external walls held off the wall so condensation cannot collect behind it.
  • Rugs, hand-dyed textiles and upholstery placed out of direct sun, which fades them quickly behind glass.
  • Closed, dust-tight cabinetry for what must stay clean; open shelving kept for objects that improve with a patina.

Thikri, araish and brass against the glass

Craft makes a Dubai apartment specific rather than generic, provided it sits in restrained detailing and is never a theme. Araish, the polished lime plaster of Jaipur’s old houses, gives a tower’s flat walls depth without adding colour. A thikri mirror panel returns the city at night in fragments rather than as one hard reflection. Hand-forged brass — door pulls, light fittings, a stair rail — ages slowly and well in chilled, dry air.

Pieces are made in Jaipur while approvals run and go by rail to Mundra or Nhava Sheva; the sea leg to Jebel Ali is typically under a week, so the real lead time is the making, crating and paperwork. Standard UAE customs duty is 5 per cent of the CIF value, Indian-made furniture can qualify for preferential rates under the India–UAE CEPA, and import VAT is 5 per cent. All of it goes into the budget before anything is ordered.

Projects we take on in Dubai
Tower apartmentsPenthousesCommunity villasBranded residencesRetail fit-outsRestaurants and hotelsFree-zone offices

Questions about working with NYKS in Dubai

Who builds the work in Dubai, and who is responsible?

A contractor licensed and listed on the emirate’s register: Dubai Law No. 7 of 2025 requires it, and owners may not appoint anyone else. That contractor is part of the team we put together with you — we tender the drawings, help you compare the bids, then coordinate and inspect while they build, permit and sign for the site. You have one studio accountable for the design and one licensed contractor accountable for the construction.

Which authority approves a fit-out on the Palm or in Dubai Marina?

It depends on who governs the plot. Palm Jumeirah falls under Trakhees, the regulator for Nakheel areas; Dubai Marina falls under Dubai Municipality. Either way, building management or the master developer issues a no-objection first, the contractor then applies for the permit, and Dubai Civil Defence reviews anything that touches fire and life safety. We confirm the route at survey, before design is fixed.

What duty and VAT will we pay on furniture made in Jaipur?

The UAE’s standard customs duty is 5 per cent of the CIF value: cost, insurance and freight. Indian-made furniture can qualify for preferential rates under the India–UAE Comprehensive Economic Partnership Agreement, in force since May 2022, if it meets the rules of origin and ships with a certificate of origin. Import VAT at 5 per cent applies either way. We confirm the position with the freight forwarder and put it in the budget before ordering.

Our apartment came developer-finished. What is worth changing?

Usually less than people expect, and different things. Sound kitchens and bathrooms can often stay. What changes a room most is lighting, joinery, wall finishes, textiles and a few commissioned pieces, and some of that, such as loose furniture, rugs and art, needs no permit at all. Moving walls, services or wet areas needs a no-objection and a permit, adds time, and is worth it only where the plan genuinely does not work.

How often will you be in Dubai while the work is on?

At the stages that decide the result: the survey, before walls and ceilings are closed, when joinery and craft are installed, and at snagging. Jaipur to Dubai is a nonstop flight of about three and a half hours, so an extra visit is easy to add when a decision needs someone in the room. Between visits we review the contractor’s progress photographs weekly and hold a video call in shared working hours.

What we do in Dubai
Interiors
Craft
Joinery
Bespoke Pieces
Site Oversight
Planning a project in Dubai?
Email UsWhatsApp Us
See our work →
We also design in Abu Dhabi · Singapore · London · Paris — and many more cities.
Start typing to see posts you are looking for.